I'll create the content for design/campaigns/standees/installation.md:
Standee Installation Guide
Installation Essentials
Successful standee installation requires:
- Proper preparation
- Correct assembly
- Secure placement
- Safety verification
- Regular checks
Pre-Installation Planning
Setup Requirements
graph TD
A[Planning] --> B[Site Check]
A --> C[Tools Ready]
A --> D[Parts Check]
B --> B1[Location]
C --> C1[Equipment]
D --> D1[Inventory]
Installation Checklist
| Phase | Requirements | Verification | Tools |
| Site Prep | Clear space | Measurement | Tape measure |
| Tools | Required equipment | Inventory | Tool kit |
| Parts | All components | Count | Checklist |
| Area | Adequate space | Measurement | Space marker |
Assembly Process
Component Assembly
| Step | Action | Tools | Time |
| Base setup | Position base | Level | 5 mins |
| Pole assembly | Connect poles | None | 5 mins |
| Panel mount | Attach panel | Brackets | 10 mins |
| Stabilization | Secure structure | Level | 5 mins |
Assembly Flow
flowchart LR
A[Unpack] --> B[Base]
B --> C[Structure]
C --> D[Panel]
D --> E[Secure]
Installation Steps
Step-by-Step Guide
| Stage | Procedure | Check Points | Notes |
| 1. Location | Mark position | Floor marks | Use template |
| 2. Base | Place & level | Stability | Check surface |
| 3. Structure | Assemble poles | Alignment | Verify fit |
| 4. Panel | Mount display | Security | Check tension |
Quality Checks
pie title "Installation Verification"
"Stability" : 30
"Alignment" : 25
"Security" : 25
"Appearance" : 20
Safety Measures
Safety Requirements
| Aspect | Standard | Verification | Action |
| Stability | No wobble | Physical test | Adjust base |
| Clearance | 3ft minimum | Measurement | Reposition |
| Access | Clear path | Visual check | Clear area |
| Security | All locks engaged | Test locks | Tighten |
Safety Protocol
graph TD
A[Safety] --> B[Check]
B --> C[Test]
C --> D[Verify]
D --> E[Document]
| Tool | Purpose | Specification | Notes |
| Level | Alignment | Standard | Digital preferred |
| Tape measure | Spacing | 5m minimum | Metric/Imperial |
| Markers | Position | Non-permanent | Floor safe |
| Tool kit | Assembly | Basic set | Phillips/Flat |
Optional Equipment
| Item | Use Case | When Needed | Alternative |
| Drill | Anchoring | Permanent install | Manual tools |
| Light | Visibility | Dark areas | Work lights |
| Gloves | Protection | Heavy parts | Hand protection |
| Cart | Transport | Multiple units | Hand carry |
Location Verification
Position Checks
flowchart LR
A[Position] --> B[Level]
B --> C[Secure]
C --> D[Clear]
D --> E[Final]
Verification Points
| Check | Method | Standard | Action |
| Position | Measure | Per plan | Adjust |
| Level | Spirit level | True level | Balance |
| Stability | Physical test | No movement | Secure |
| Clearance | Measure | 3ft minimum | Reposition |
Maintenance Procedures
Regular Checks
| Item | Frequency | Check Points | Action |
| Stability | Daily | Base secure | Adjust |
| Structure | Weekly | Connections | Tighten |
| Panel | Monthly | Tension | Adjust |
| Hardware | Monthly | All parts | Replace |
Maintenance Schedule
gantt
title Maintenance Timeline
dateFormat YYYY-MM-DD
section Checks
Daily Review :a1, 2024-01-01, 1d
Weekly Check :a2, 2024-01-01, 7d
Monthly Service :a3, 2024-01-01, 30d
Troubleshooting Guide
Common Issues
| Problem | Cause | Solution | Prevention |
| Wobble | Uneven surface | Adjust base | Check floor |
| Lean | Poor assembly | Reassemble | Follow guide |
| Loose panel | Wear | Tighten | Regular checks |
| Damage | Impact | Repair/Replace | Clear area |
Resolution Process
graph TD
A[Issue] --> B[Diagnose]
B --> C[Fix]
C --> D[Test]
D --> E[Document]
Installation Success Tips
- Follow sequence
- Check stability
- Verify position
- Document setup
- Regular maintenance
Resources
- Setup guide
- Tool checklist
- Safety guidelines
- Maintenance log
- Troubleshooting guide
View Materials → Check Specs →